{"id":26423,"date":"2023-06-14T15:40:12","date_gmt":"2023-06-14T13:40:12","guid":{"rendered":"https:\/\/web_stranica.ephzhb.ba\/?p=26423"},"modified":"2024-07-16T13:21:51","modified_gmt":"2024-07-16T11:21:51","slug":"wind-farm-poklecani-public-inspection-into-the-request-for-a-preliminary-environmental-impact-assessment-2","status":"publish","type":"post","link":"https:\/\/ephzhb.ba\/en\/wind-farm-poklecani-public-inspection-into-the-request-for-a-preliminary-environmental-impact-assessment-2\/","title":{"rendered":"Wind Farm Pokle\u010dani &#8211; Public inspection into the Request for a Preliminary Environmental Impact Assessment"},"content":{"rendered":"<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\">Pursuant to Articles 40 and 70 of the Law on Environmental Protection (Official Gazette of the Federation of BiH, 15\/21) the Federal Ministry of Environment and Tourism made available to the public the Request for a Preliminary Environmental Impact Assessment of the investor <\/span>JP &#8220;ELEKTROPRIVREDA HZ HB&#8221; d.d. Mostar\u00a0<span style=\"font-family: arial, helvetica, sans-serif;\">for the Project of construction of Wind Farm Pokle\u010dani, installed capacity 132 MW, in municipality Posu\u0161je and the same is available <a href=\"https:\/\/fmoit.gov.ba\/bs\/okolisne-dozvole\/javne-rasprave-i-javni-uvidi\/javni-uvid-u-zahtjev-za-prethodnu-procjenu-utjecaja-na-okolis-investitora-jp-elektroprivreda-hzhb-d-d-mostar-za-projekat-izgradnje-ve-poklecani-instalirane-snage-132-mw-u-opcini-posusje\">at this link<\/a>.<\/span><\/p>\r\n<p style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif;\">Remarks, suggestions and opinions to this Request may be submitted to the Federal Ministry of Environment and Tourism in written form within 30 days from the day of its publication on the website (13 June 2023) at the address: the Federal Ministry of Environment and Tourism, Hamdije \u010cemerli\u0107a 2 Street, 71000 Sarajevo.<\/span><\/p>","protected":false},"excerpt":{"rendered":"Pursuant to Articles 40 and 70 of the Law on Environmental Protection (Official Gazette of the Federation of BiH, 15\/21) the Federal Ministry of Environment and Tourism made available to the public the Request for a Preliminary Environmental Impact Assessment of the investor JP &#8220;ELEKTROPRIVREDA HZ HB&#8221; d.d. Mostar\u00a0for the Project of construction of Wind [&hellip;]","protected":false},"author":25,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[254,255],"tags":[],"class_list":["post-26423","post","type-post","status-publish","format-standard","hentry","category-priopcenja-en","category-novosti-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/ephzhb.ba\/en\/wp-json\/wp\/v2\/posts\/26423","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ephzhb.ba\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ephzhb.ba\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ephzhb.ba\/en\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/ephzhb.ba\/en\/wp-json\/wp\/v2\/comments?post=26423"}],"version-history":[{"count":3,"href":"https:\/\/ephzhb.ba\/en\/wp-json\/wp\/v2\/posts\/26423\/revisions"}],"predecessor-version":[{"id":26543,"href":"https:\/\/ephzhb.ba\/en\/wp-json\/wp\/v2\/posts\/26423\/revisions\/26543"}],"wp:attachment":[{"href":"https:\/\/ephzhb.ba\/en\/wp-json\/wp\/v2\/media?parent=26423"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ephzhb.ba\/en\/wp-json\/wp\/v2\/categories?post=26423"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ephzhb.ba\/en\/wp-json\/wp\/v2\/tags?post=26423"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}